The following major renovations and improvements have been undertaken in recent times. Interiors vary, some retaining the original layout and others repurposed to suit individual tastes.
2014/15: refurbishment of all balconies including the installation of new glass throughout
2017: original roof was covered with new synthetic material, with some insulation
2018: replacement of all external doors and the Entryphone system
2021: installation of electric security gates
2021: garage block refurbishment.
2022 (?): replacement of exterior lighting
2024: exterior paving replaced front and rear
2025: electrical certification obtained along with internal fuse box repair and replacement of external single socket outlet in the South garden
2025: re-flaunching and repointing of rear north and south steps
2025: installation of 3 rainwater pipes for the entry doors to the rear south and front/rear north entrances
2026: fire exit signage installed throughout the building
2026: tree surgery front and rear and patching of south front beech hedge

These images below, of an unmodernised flat taken before it was refurbished, show how it looked when first built. Note the unusual square parquet.